AECOM logo
AECOM Verified
Engineering, Construction, Infrastructure, Consulting, Architecture

Data Center Construction Managers

Denver, COOnsiteFull TimePosted 1 month ago

Is this role right for you?

Upload your resume and get a skill-by-skill breakdown — see exactly where you match, where you're close, and what to highlight. Not a mystery percentage.

Get a tailored resume highlighting what this role needs.

Required skills

  • Data Center Construction Managers
  • mechanical
  • electrical
  • shop drawings
  • submittals
  • installation
  • commissioning
  • non-conformances
  • corrective actions
  • inspection reports

Nice to have

  • CQM
  • professional certifications
  • construction management
  • quality management

Role summary

AECOM is seeking Data Center Construction Managers for an onsite position in Denver, CO. Responsibilities include inspecting mechanical and electrical systems for compliance, reviewing contractor submittals, monitoring installation and testing, identifying non-conformances, maintaining inspection reports, overseeing corrective actions, and documenting critical tests. The role requires verifying material and workmanship quality, resolving issues with contractors and engineers, and coordinating client outage procedures and GC workplans. A Bachelor's degree with eight years of relevant experience is required, with preferred qualifications including 7 years of construction/quality management experience and professional certifications.

AECOM is seeking Data Center Construction Managers. This position will be onsite in Denver, CO. 

Job responsibilities include and are not limited to the following:

  • Inspect building systems, including mechanical and electrical, for compliance with contract requirements and industry standards.
  • Review contractor shop drawings and submittals to confirm alignment with project specifications.
  • Monitor the installation, testing, and commissioning of electrical and mechanical systems, confirming proper functionality and performance.
  • Identify and report non-conformances, coordinating with contractors and engineers to implement corrective actions.
  • Maintain detailed inspection reports, logs, and records for quality control and compliance tracking.
  • Oversee corrective actions for unacceptable construction work and support final inspections, punch lists, and project closeouts.
  • Witness and document critical tests, such as pressure tests, leak tests, and system start-ups.
  • Verify the quality of materials, workmanship, and equipment installations to confirm adherence to project specifications.
  • Work closely with contractors, engineers, and other inspectors to resolve issues.
  • Maintain professionalism in attire and communication during all time on site and in meetings.
  • Represent the Client in alignment with contract requirements and project deliverables.
  • Coordinate client Outage / Shutdown Procedure.
  • Coordinate GC Workplan and advise if the construction contractor fails to promptly remove, correct, or replace unacceptable construction work, and assess any delays caused by such failure.

Minimum Requirements

  • BA/BS plus eight years of relevant experience or demonstrated equivalency of experience and/or education.

Preferred Requirements:

  • 7 years of experience with construction and/or quality management.
  • CQM or other professional certifications.
  • Bachelor’s degree in construction management, engineering, or architecture.
  • Sponsorship for US employment authorization is not available now or in the future for this position.
  • Relocation is not available for this position.

At AECOM, we are committed to maintaining a secure and trustworthy recruitment process and take any fraudulent hiring activity seriously. To support this commitment, all newly hired employees are required to attend an in-person Day 1 onboarding at an AECOM office location as a condition of employment.

About AECOM 

AECOM is proud to offer comprehensive benefits to meet the diverse needs of our employees. Depending on your employment status, AECOM benefits may include medical, dental, vision, life, AD&D, disability benefits, paid time off, leaves of absences, voluntary benefits, perks, flexible work options, well-being resources, employee assistance program, business travel insurance, service recognition awards, retirement savings plan, and employee stock purchase plan. 

AECOM is the global infrastructure leader, committed to delivering a better world. As a trusted professional services firm powered by deep technical abilities, we solve our clients’ complex challenges in water, environment, energy, transportation and buildings. Our teams partner with public- and private-sector clients to create innovative, sustainable and resilient solutions throughout the project lifecycle – from advisory, planning, design and engineering to program and construction management. AECOM is a Fortune 500 firm that had revenue of $16.1 billion in fiscal year 2025. Learn more at aecom.com. 

What makes AECOM a great place to work 

You will be part of a global team that champions your growth and career ambitions. Work on groundbreaking projects - both in your local community and on a global scale - that are transforming our industry and shaping the future. With cutting-edge technology and a network of experts, you’ll have the resources to make a real impact. Our award-winning training and development programs are designed to expand your technical expertise and leadership skills, helping you build the career you’ve always envisioned. Here, you’ll find a welcoming workplace built on respect, collaboration and community—where you have the freedom to grow in a world of opportunity. 

As an Equal Opportunity Employer, we believe in your potential and are here to help you achieve it. All your information will be kept confidential according to EEO guidelines. 

Work with Us. Change the World.

At AECOM, we're delivering a better world. Whether improving your commute, keeping the lights on, providing access to clean water, or transforming skylines, our work helps people and communities thrive. We are the world's trusted infrastructure consulting firm, partnering with clients to solve the world’s most complex challenges and build legacies for future generations.

There has never been a better time to be at AECOM. With accelerating infrastructure investment worldwide, our services are in great demand. We invite you to bring your bold ideas and big dreams and become part of a global team of over 50,000 planners, designers, engineers, scientists, digital innovators, program and construction managers and other professionals delivering projects that create a positive and tangible impact around the world.

We're one global team driven by our common purpose to deliver a better world. Join us.

Ready to apply?
You'll be redirected to AECOM's application page.

Similar roles

See how RiseMe works

Match, tailor, and prep so you send fewer applications and land more interviews.