
Construction Manager, Data Center Construction
Required skills
- Electrical Engineering
- Mechanical Engineering
- MS Excel
- MS Word
- Windows Operating Systems
- power management
- power monitoring systems
- construction project management
- construction vendors
- contractors
Nice to have
- data centers
- critical infrastructure
- engineering documentation
- standard operating procedures
- regulations
- Life Safety
Role summary
AWS is seeking a Data Center Construction Manager to oversee the construction of their global data centers. This role involves managing all aspects of construction projects, including cost, schedule, and quality, from design review and bidding through execution and closeout. The Construction Manager will act as the owner's representative on-site, interacting directly with contractors and vendors to ensure projects meet Amazon's high standards for safety, security, and efficiency. The position requires a Bachelor's degree in Electrical or Mechanical Engineering, experience with power systems, and a willingness to travel extensively within the US.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
As a Data Center Construction Manager you will be a part of a creative, diverse team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient, cost-effective designs. You will work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world. You will be on the construction site daily interacting with the construction trades, as Amazon’s owner’s representative and be directly responsible for driving cost, schedule, and quality while managing construction vendors and contractors building data centers.
At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding to construction execution and final hand-off to our customers. We are a diverse, upbeat, creative, team of engineers and managers working on a daily basis to develop innovative data centers for our Customers.
This position requires that the candidate selected be a US Citizen.
This position requires domestic travel of 50% or more within the continental United States. The incumbent must be willing and able to travel to various company locations, client sites, and/or project locations as business needs dictate.
Key job responsibilities
The Data Center Construction Manager will be responsible for construction project management and oversight of construction related activities as they relate to new builds or general capital projects which includes the ownership of the project scope, quality, schedule, and budget. Some of the typical daily tasks of the Construction Manager:
- Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
- Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
- Create construction project scope and request for proposals.
- Financial analysis of construction.
- Construction project management for specific initiatives aimed at increasing the resiliency of our data centers.
- Constructability reviews of electrical and mechanical designs associated with the construction of new data centers or optimization of existing data centers.
- Construction document management including submittal review, RFI’s, change orders, and invoicing.
- Construction project quality control.
- Record and report key construction metrics to team members and management.
- Drive teams to perform troubleshooting and root-cause failure analysis associated with equipment failures.
- Be a leader within the group as well as within internal and external teams that support the data center.
About the team
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon conferences, inspire us to never stop embracing our uniqueness.
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. Basic Qualifications: - Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
- Experience carrying new design concepts through exploration, development, and into deployment or mass production
- Experience in MS Excel, Word, and Windows Operating Systems
- Experience with power management and power monitoring systems Preferred Qualifications: - 5+ years of project management in data centers or comparable critical infrastructure experience
- Knowledge of critical data center equipment
- Knowledge of engineering documentation, electrical diagrams and standard operating procedures
- Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA
- Experience in project management in data centers or comparable critical infrastructure
- Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure
- Experience reading and interpreting construction specifications and drawings for all domains
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, VA, Fairfax - 111,300.00 - 186,100.00 USD annually
Sample Amazon interview questions
- 1
Implement Search a 2D Matrix
codingtechnicalmedium - 2
Implement LRU Cache
codingtechnicalmedium - 3
Implement Best Time to Buy and Sell Stock
codingtechnicaleasy - 4
Implement Flood Fill
codingtechnicaleasy - 5
Implement Top K Frequent Elements
codingtechnicalmedium
Get started to unlock a personalized interview prep pack for this role.
Similar roles
Data Center Project Manager, US-West CPIAmazon · Boardman, OR · Onsite
Product Manager III, TechnicalAmazon · Bellevue, WA · Onsite
Construction ManagerOverwatch Construction Management · Kerrville, TX · Onsite
Senior Preconstruction Manager- ManufacturingChoate Construction · Savannah, GA · Onsite
Construction ManagerLennar · Pensacola, FL · Onsite
Field Construction Manager (Orange, CT)LaBella Associates · Orange, CT · Onsite
